Austria · Subsidies

Renovation Bonus 2026 Heating Replacement Austria: BMK + Raus aus Öl + 9 States

Austrian Habsburg-era cityscape with alpine backdrop, illustrating heating renovation subsidies in Austria.

For heating-system replacement in Austria, 2026 brings a subsidy stack from multiple sources: BMK Renovation Bonus up to 23,000 euros, Raus aus Öl bonus up to 11,000 euros, Sauber Heizen für Alle up to 100 percent for low-income households, and nine state-level housing subsidies. Here you'll see which programme covers what, how the stacks combine, what to watch for when applying, and which typical mistakes lead to rejection. As of May 2026.

Reading time: ~9 min

As of May 2026 BMK verified 9 states overview

1. BMK Renovation Bonus and Raus aus Öl bonus (federal)

The federal stack for heating-system replacement in Austria consists of two central programmes: the BMK Renovation Bonus (Sanierungsbonus) as base subsidy and the Raus aus Öl bonus (Out of Oil and Gas, Austrian phaseout programme) as a targeted top-up for replacing oil and gas heating systems. Both are administered by Kommunalkredit Public Consulting (KPC, the Austrian state grant agency) on behalf of the federal Ministry for Climate Action (BMK); both run through the central platform umweltfoerderung.at.

BMK Renovation Bonus 2026: up to 23,000 euros

The Renovation Bonus is the base subsidy for any heating renovation with a renewable target system. Eligible systems are heat pumps (air-water, brine-water, water-water), pellet heating, wood-chip plants, solar thermal, and connection to a district heating network operated predominantly with renewables. The maximum subsidy in 2026 is 23,000 euros per residential unit, depending on the chosen system and verified efficiency. In multi-storey residential buildings, the flat rate per unit may be lower; in those cases, the state-level housing programme kicks in additionally.

Heat pump
23,000 €
Max. Renovation Bonus
Pellets
18,000 €
Max. Renovation Bonus
District heat
15,000 €
Max. connection subsidy
Raus aus Öl
+11,000 €
Top-up (oil/gas swap)

Figures as maximum flat rates 2026 per BMK information. Actual subsidy depends on application details, plant size and verified efficiency.

Raus aus Öl bonus: up to 11,000 euros additional

The Raus aus Öl bonus launched in 2024 as a successor programme and targets households that are swapping their oil or gas heating system for a renewable one. The maximum top-up sits at 11,000 euros per residential unit and is combinable with the Renovation Bonus. Practically: you apply for both through a single application, and KPC bundles them in the official decision. The Raus aus Öl bonus runs through the end of 2027 for now and is expected to be extended, although that is not yet politically locked in. As of May 2026, the conditions are stable; a subsidy is not guaranteed and depends on the available budget. In high-application phases, applications are processed on a first-come-first-served basis.

Combination with related glossary topics

Heating replacement in Austria is economically especially attractive because Austria has imposed a CO2 levy on fossil fuels since 2022. As of 2026, the surcharge sits at 55 euros per tonne of CO2 (annual BMK escalation), which corresponds to roughly 14 to 15 cents extra per litre of heating oil. With a 3,000-litre annual consumption, that's around 440 euros of CO2 burden in 2026 alone, fully avoided with a heat pump. The underlying heating oil price additionally hangs on the international Brent market, which fluctuates independently of political decisions.

2. 9 state housing subsidies overview

In addition to the federal programmes, all 9 federal states have their own housing subsidies that can be used for heating replacement on top. The amounts vary widely because each state sets its own priorities. The following overview shows the typical maximum flat rates per residential unit, as of May 2026. Verify the current values before applying on the respective state website; the subsidy levels are usually updated at least once per year.

Federal state Max. heat-pump subsidy Notes
Vienna up to 8,000 € Plus renovation top-up on thermal upgrades
Lower Austria up to 10,000 € Highest standalone bonus in DACH, combinable with federal
Upper Austria up to 7,500 € Energy-Saving Association (ESV) as contact
Styria up to 6,500 € Plus climate bonus 1,000 € on oil swap
Tyrol up to 8,500 € Alpine bonus for high-altitude locations
Vorarlberg up to 9,000 € Income-dependent tiers
Salzburg up to 7,000 € Plus voucher for energy consultant
Carinthia up to 5,500 € Special programmes for renovation hotspots
Burgenland up to 6,000 € Plus photovoltaic coupling possible

Figures as maximum flat rates, rounded, as of May 2026. Actual subsidy depends on application, income, plant size and available state budget. Please verify on the state website before applying.

Stacking possibilities: up to 75 percent combined

The central question for applicants: how high can the combined subsidy stack go? Practically, federal (Renovation Bonus plus Raus aus Öl) and state can be combined, but with a cap. The maximum total subsidy may not exceed 50 to 75 percent of the total plant costs in most federal states. Anyone eligible for Sauber Heizen für Alle can go beyond that to 100 percent, but that is income-dependent and not the regular case.

A concrete example: an air-water heat pump for a typical single-family home costs 25,000 to 32,000 euros including installation. With the federal stack (Renovation Bonus 18,000 euros plus Raus aus Öl 8,000 euros = 26,000 euros) and the state-level housing subsidy in Lower Austria (10,000 euros), arithmetically even over-coverage would be possible. In practice, the 50-to-75 percent cap applies, so the actual net investment burden for the household lands at around 8,000 to 12,000 euros. That's a significant lever compared with Germany (a comparable stack there usually delivers 30 to 45 percent subsidy) and even more so against countries without stacking logic.

What does the heating swap net cost you?

Calculate in 60 seconds how subsidy, investment, CO2 avoidance and heating-oil savings combine. The energy cost calculator shows this scenario-specifically for Austria.

Calculate in 60 seconds

3. Sauber Heizen für Alle (low-income households)

Sauber Heizen für Alle (Clean Heating for All) is the social programme for heating replacement in Austria. It targets low-income households that could otherwise not afford a swap. Unlike the Renovation Bonus, which grants a percentage subsidy, Sauber Heizen für Alle can cover up to 100 percent of heating replacement costs. The programme is administered by Kommunalkredit Public Consulting (KPC, Austrian state grant agency), like the other federal programmes.

Income thresholds

The income thresholds follow the equalisation-supplement guideline of Austria's pension insurance. As of May 2026, the limits sit at around 1,155 euros gross monthly income for individuals and roughly 1,825 euros for married couples or registered partnerships. For each dependent child, the limit increases by about 180 euros. These values are adjusted annually; the exact amounts are on umweltfoerderung.at. Anyone just over the threshold should still check whether, taking into account work-related expenses or extraordinary burdens, eligibility might apply.

Important on eligibility check: Income thresholds are strictly defined; a preliminary check on the state website or directly with KPC is mandatory. In borderline cases, there are sometimes special-case provisions (such as care-dependent relatives in the household) that must be reviewed individually.

Subsidy level and requirements

With full eligibility, up to 100 percent of plant costs can be funded, but with a cap per residential unit (as of May 2026 around 30,000 euros). The requirements are: primary residence in Austria, ownership or permanent right of use for the residential unit being renovated, swap of a fossil heating system (oil, gas, coal) for a renewable one (heat pump, pellets, wood chips, district heating from renewables), income proof over the last 12 months. The rental situation also matters; the programme primarily addresses owners or owner-equivalent rights of use.

4. Application path: 5 steps from energy consultant to payout

The application path for Renovation Bonus, Raus aus Öl bonus and Sauber Heizen für Alle is identical because all programmes are administered by KPC. The process typically takes 3 to 6 months from the first energy-consultant appointment to payout after implementation; in summer rather shorter (lower application volume), in autumn rather longer.

  1. Energy-consultant appointment (klimaaktiv consultant or equivalent) Before applying, a qualified energy consultation must take place. The klimaaktiv energy consultation is the standard variant and is often itself subsidised (consultation vouchers up to 200 euros per appointment). The consultant produces an inventory of the existing heating system, checks the hydraulics and supply temperatures, and recommends the appropriate renewable system.
  2. Obtain quotes from qualified specialist contractors At least two quotes from registered specialist contractors are mandatory. The contractors must hold the necessary licences (heating construction, plumbing, and where applicable refrigeration/heat-pump technology). Make sure the contractors have experience with the relevant technology; a heat pump requires a different sizing approach than a pellet plant.
  3. Submit the application to KPC (umweltfoerderung.at) The application is submitted online via umweltfoerderung.at. You attach the energy-consultant report, at least two quotes, proof of ownership, and (for Sauber Heizen für Alle) income proof. The application must be submitted before implementation; there is no retroactive funding.
  4. Approval decision and implementation After review, you receive an approval decision with subsidy amount and conditions. Only then can implementation begin. The implementation deadline is typically 12 months, meaning the plant must be commissioned within one year of approval. In case of delays, an extension can be requested.
  5. Final invoice and payout After commissioning, you submit the final invoice with all original receipts, commissioning protocols and specialist-contractor confirmations. Payout typically occurs 4 to 8 weeks after complete final invoicing. For a heat pump, the hydraulic balancing (mandatory) must also be documented.

Realistic timeline bottom line: plan 6 to 9 months from the first energy-consultant appointment to payout. The payout occurs retroactively, not in advance, meaning you must finance the plant fully in the meantime. Many homeowners use a bridge loan or modernisation financing through their house bank, which is feasible at current interest rates (as of May 2026).

5. Common mistakes that lead to rejection

A not insignificant share of applications is rejected or must be revised. The most common pitfalls are usually formal in nature, not technical. The following points are the typical stumbling blocks where applications fail or get delayed.

  • Application submitted only after implementation: The classic. Anyone who has the plant installed out of enthusiasm and then tries to apply for the subsidy gets nothing. The application must be in place before implementation starts.
  • No qualified energy consultant involved: Without klimaaktiv consultation or equivalent proof, the application is not accepted. The consultant must be registered and deliver a documented report.
  • Specialist contractor without required licence: Heat-pump installations often require a refrigeration/heat-pump technology licence. A normal heating installer without this capability can install pellets but not a heat pump. Check this upfront.
  • Tenancy without permanent right of use: Tenants without long-term tenancy rights typically cannot apply themselves. Here the owner must apply, which is often administratively difficult.
  • Wrong plant size or efficiency below minimum: A heat pump must achieve a certain annual performance factor (typically 3.5 or higher), otherwise the subsidy is reduced or cancelled. The plant size must also match the building; an oversized plant is not fully eligible.
  • Hydraulic balancing not performed: For heat pumps, hydraulic balancing is mandatory for the full subsidy. If skipped or not documented, the payout can be reduced.
Bottom line on application strategy: Plan at least 1 to 2 months of lead time before implementation starts. First get a qualified energy consultant, then at least two quotes, then submit the application. Only start implementation after the approval decision. Experience shows this saves the most frustration moments.

A bridge to impact calculation: anyone who wants to know how investment and CO2 burden affect the household budget together can supplement that on the mobility side with the Commuter Allowance 2026 calculator and check additional social programmes in the Energy Cost Compensation entry. The complete picture of all Austrian aids is on the Austria hub; a conceptual framing on the pass-through effect in energy-price shocks lives in the glossary.

Model your net path with concrete numbers

The energy cost calculator combines subsidy, investment, CO2 avoidance and heating-oil savings in a consistent picture. In 60 seconds with your own consumption values.

Start the energy cost calculator

6. Frequently asked questions

How high is the maximum Renovation Bonus in Austria in 2026?
Austria's BMK Renovation Bonus (Sanierungsbonus) pays up to 23,000 euros per residential unit in 2026 for swapping a fossil-fuel heating system to a renewable one (heat pump, pellets, district heating from renewables). On top, the Raus aus Öl bonus adds up to 11,000 euros specifically for replacing oil and gas heating systems, combinable with the Renovation Bonus. Anyone with low household income (gross household income below defined thresholds) can additionally claim the Sauber Heizen für Alle programme, which covers up to 100 percent of costs. On top come the state-level housing subsidies, which add between 1,500 and 12,000 euros depending on the federal state. In total, a stack covering 50 to 75 percent of total costs is realistic; in individual cases through Sauber Heizen für Alle up to 100 percent.
What is the difference between the Renovation Bonus and the Raus aus Öl bonus?
The BMK Renovation Bonus is the base subsidy for any swap from a fossil heating system to a renewable one. The Raus aus Öl bonus (Out of Oil and Gas, Austrian phaseout programme) is a targeted top-up specifically for replacing oil and gas heating systems; it addresses exactly the heating substitution that Austria's climate law prioritises. Both subsidies are in principle combinable, but not stacked arbitrarily. Practically: you apply for the Renovation Bonus first, then add the Raus aus Öl bonus, and the full subsidy package is bundled in the official decision. The Raus aus Öl bonus launched in 2024 as the successor to the original programme and runs through the end of 2027 for now. Applications go through umweltfoerderung.at, the central BMK platform.
What about the Klimabonus in Austria in 2026?
The Klimabonus as a general per-capita payout was abolished at the end of 2024. Until 2024, every person with primary residence in Austria automatically received between 110 and 290 euros per year as a CO2-pricing refund. Since 2025, that flat payout no longer exists. As a partial replacement, the commuter euro (Pendlereuro) was tripled in 2024 (from 2 euros to 6 euros per km distance per year), but that only applies to working commuters. Important clarification: Klimabonus and Renovation Bonus are two different programmes. The Renovation Bonus for heating replacement continues and is even being expanded in 2026, while the general per-capita Klimabonus has been gone since 2025.
Which requirements must I meet for Sauber Heizen für Alle?
Sauber Heizen für Alle targets low-income households and can cover up to 100 percent of heating-replacement costs. The income thresholds follow the equalisation-supplement guideline of Austria's pension insurance. As of May 2026, the limits sit at around 1,155 euros gross monthly income for individuals and roughly 1,825 euros for married couples or registered partnerships, plus increases for children. These values are adjusted annually. Concrete requirements: primary residence in Austria, ownership or permanent right of use for the residential unit being renovated, swap of a fossil heating system to a renewable one (heat pump, pellets, district heating), income proof over the last 12 months. Application via Kommunalkredit Public Consulting (Austrian state grant agency), which runs the programme on behalf of BMK. Detail requirements change annually; check the current status on umweltfoerderung.at before applying.

Ready to calculate?

You now know the subsidy stack. Try the energy cost calculator with your own numbers and see how investment and CO2 avoidance affect you net.

Calculate my number now